Installation

  • The installation of the pods is often carried out by the main contractor, who will take receipt of the pods that are delivered to a previouslyagreed programme.
  • If required installation assistance can be provided by Kondor who may use the expertise of a specialist sub-contractor.
  • The manor in which the pods are installed into the building is greatly dependent on the type of structure.
  • They can be craned into location as the building is erected.
  • Alternatively, they can be manoeuvred into the side of a building using a lifting cradle or platform on which the pod can be landed and then pushed into its final location with the use of appropriate equipment.
  • The pods can then be lined and levelled to an agreed datum using resilient pads or shims to the perimeter of the pod base.