Kondor’s new SIPS Tiled Pod, an industry first, providing all-round improved performance. No external steel frame required, low profile floor, 30% lighter than a steel frame alternative.
Kondor’s new SIPS Tiled Pod, an industry first, providing all-round improved performance. No external steel frame required, low profile floor, 30% lighter than a steel frame alternative.
Delivered flat-packed, part assembled or fully assembled.
Super quick installation, up to 70% lighter
and low profile floor of just 5mm thin.
Delivered flat-packed, part assembled or fully assembled. Super quick installation, up to 70% lighter and low profile floor of just 5mm thin.
This eliminates the need to climb to fix crane lifting chains to the top of the pod as per alternative construction methods. This increases speed of loading/unloading as well as improved health and safety standards.
Eliminating any external frame requirement, and with Kondor’s light-weight wall structure, these Pods are typically 30% lighter than an equivalent pod with a steel structure and significantly lighter than a concrete pod.
A steel framed floor with a 10mm thin steel plate provides a flush door entry opportunity for your build without the need to create a recess to accommodate (as you would with traditional steel frame or concrete pods).
Kondor’s Acrylic Capped ABS Pods are typically 70% lighter than traditional light-gauge steel constructed Pods. Nominal weight circa 300kg.
Our Pods can be provided as a fully finished unit or in kit-form for site assembly. The Flat-packed kit-form option is ideal for refurbishment projects.
Exceeding 100 standard designs as a starting point for your architect. Choose the closest for your project and amend from there.
Kondor's flat-pack or part-assembled pods provide the ideal kit-form solution for projects requiring international shipping, maximising container space to minimise transportation costs.
Unique construction methods, envisaged and produced by the Kondor team, is a market first providing many benefits over alternative pod building methods.
A thin plate provides a flush door entry opportunity for your build without the need to create a recess to accommodate (as you would with traditional steel frame or concrete pods).
CNC machined panels provide for extremely accurate structure tolerances. Such accuracies eliminate build errors and post delivery/fitting problems for a speedier install.
Kondor’s building methods allows for increased accuracy, quicker construction and less labour, all contributing to a lower cost per pod when compared to alternative build methods, without compromising on the interior specification.
Where required, any cables and/or pipework will be recessed within the wall, routed from the outside for pin-point accuracy. If external cabling or pipework is required then this can be accommodated also.
The use of multi-layer composite tubing (Pegler Tectite (or similar) pex barrier pipe with aluminium core) ensures long life, high performance and greatly reduced system noise, as well swift and efficient installation.
Pegler Tectite (or similar) brass push fit fittings ensures quick installation, perfectly clean internal bores and top quality connections on your finished pod, in transit and in situ.
Do we have the greenest pods available? We think so...
The walls are made from a sandwich composite with a 25mm thick Ravatherm XPS core providing ready-insulated walls for thermal and sound efficiency built in. Thermal Conductivity of 0.033 W/m.K and a weighted sound index rating of 44db which would improve even further once lined externally with plasterboard.
Kondor’s tiled pods and their Acrylic Capped ABS Pods are typically 30% or 70% lighter respectively than traditional light-gauge steel constructed Pods. This provides huge CO2 savings in transportation costs which is exponentially increased with their unique flat-pack or part-assembled options.
As an environmentally conscious company Kondor endeavour to use recycled materials wherever possible.
Built with gusto by CREATEINN